| Overview of the new raised
garden area |
|
Here is the view from the
back side |
 |
|
 |
| A double tunnel makes room
for a future point to point |
|
Note the power post in the
center. Not a good idea. |
 |
|
 |
| Two bridges will take the
track over the lower track |
|
I used stakes to mark the
level of the track. Then filled as needed. |
 |
|
 |
| The tunnel will support a
water fall flowing into the pond |
|
Finished? No, wife says
"It's too small, we need a bigger pond!" So, this lasted until
spring 2005 |